timeline

timeline/schedule

            design details/shop drawings/CDs

site measurements & exact locations for all 4 projects………….…May/June 2017
stone dimensioning/fossil research & design for flume………….....May/June 2017
design refinement/CAD layout for fly................................................June/July 2017
image research & interviews for flow…………………………........May/June 2017

            fabrication/installation      
                       
                        free (tree painting)
                                    final scoping/materials acquisition/rental reservations………....July/Aug 2017
                                    work on site……………………………………………………..Sept/Oct 2017

                        fly (birdboxes/infrastructure)
                                    grant decision/final scoping……………………………….......April/May 2017
                                    workshop planning……………………………………..……...May/June 2017
                                    materials acquisition……………………………………………June/July 2017
                                    studio fabrication.........................................................................July-Sept 2017
                                    outreach/workshops…………………………………….........…Sept-Nov 2017
                                    installation……………………………………………………...................TBD

                        flow (photo installation)
                                    *photographer interviews…………..……………………….…May/June 2017
                                    image acquisition (if no photographer secured)………………..May/June 2017
                                    *photography (w local photographer)…………………….….....July/Aug 2017
                                    printing (sans photographer)………………………………...….July/Aug 2017
                                    *printing (w local photographer)……………………………......Sept/Oct 2017
                                    installation (sans photographer)…………………………....…...Sept/Oct 2017
                                    *installaton (w local photographer)……………………………..Oct/Nov 2017

                        flume (stonework)
                                    stone selection/design details/order placement……....……..…May/June 2017
                                    fabrication (cutting, honing, engraving)………………………June/Aug 2017
                                    site prep/load out……………………………………………….Sept/Oct 2017
                                    installation………………………………………………………Sept/Oct 2017


Exact scope, approach and timeline of fly is contingent upon outcome of Innovative Grant.  If funding doesn’t come through, those funds will be supplemented by funding from the base public art project, replacing birdbox post project with artist providing more of a community-liaison/artist-residency approach.  If the grant comes through, the artist will provide infrastructure as originally-planned.  Given all the unknowns at this point and the need to coordinate outreach efforts with multiple organizations (related to school academic years), exact end date for installation of this piece are to be determined.

Exact approach and timeline of flow is similarly contingent upon a potential collaboration with a local photographer.  If an agreed esthetic approach with a local photographer can be developed, there’s an additional 2 months built into the timeline to allow for their photographic work.  Otherwise I will obtain suitable stock photography through an image bank with an earlier installation date.


All timelines noted here are estimates based on assumptions about several factors that are beyond the artist’s control (timely reviews, community collaborations, invoice turnaround, subcontractor performance, etc).  While the desire is to complete the work in a timely and efficient manner, since we aren’t under a base project coordination deadline, patience is the watchword…and, as always, quality in all it’s immeasurable aspects is the ultimate arbiter.